Flow Control (USA)

We provide inspection and re certification services for all high-pressure surface piping used in pressure pumping operations.
Examples of these applications are fracking, fluid pumping, nitrogen pumping, production testing (flow back) and cementing. All work is performed to IRP 8 and IRP 4 standards. The published minimum requirement is a level 1 inspection annually. Customers may choose to have level 2 or 3 inspections done to provide additional confidence in equipment safety.
Level 1
- Visual inspection
- Ultra-sonic wall thickness
- Remove wings/clean wing end & thread end
- Magnetic particle inspection (MPI)
- Install stainless steel ID banding
Level 2
- Visual inspection
- Ultra-sonic wall thickness
- Remove wings
- Sand Blast
- Magnetic Particle Inspection (MPI)
- Pressure Test
- Paint
- Install stainless steel ID banding
Service Level 3
- Visual inspection
- Ultra-sonic wall thickness
- Remove wings
- Sand blast
- Complete tear down/rebuild
- Magnetic particle inspection (MPI)
- Pressure test
- Paint
- Install stainless steel ID banding